企庭中国民营经济网
导航菜单

北京2027新能源机制电价竞价,8.5亿度电量待申报

我要采购新能源/电力交易AI 精选📍 北京市👁 02026-09-26 17:23
北京市发改委发布京发改〔2026〕1598号通知,启动2027年新能源增量项目机制电价竞价。本次竞价电量总规模8.5亿千瓦时,风电、光伏统一申报、统一出清,竞价上限0.3598元/千瓦时,入选项目机制电价执行期限12年。这是新能源项目锁定长期稳定电价收益的窗口,对投资方而言,机制电价相当于为项目收益托底,越早以较低电价申报越可能入选。 机会点在于:一是竞价主体范围明确,2025年6月1日至2027年12月31日投产且未纳入过机制电价的新能源项目均可参与,分布式光伏可独立或聚合参与,自然人户用分布式光伏业主也有资格;二是单个项目申报电量上限按装机容量乘以年度平均发电利用小时数扣除厂用电确定,北京光伏按1450小时、风电按2000小时、厂用电率3%计算,项目方可据此测算可申报电量;三是价格优先边际出清,申报规模少于总规模时全部纳入、最高申报价即为机制电价,存在策略空间。 谁该参与:在京有集中式光伏、集中式风电、分布式光伏、分散式风电项目且符合投产时间窗口的发电企业、分布式聚合商、自然人户用光伏业主,以及为项目提供申报代理、电量测算、材料合规服务的咨询机构。 怎么参与:本通知发布5个工作日内国网北京市电力公司发布竞价公告,明确竞价平台网址、时间安排、组织程序和咨询电话;项目方需在规定时间内通过竞价平台填报基本信息并提交申报材料,经市电力公司初审获得竞价资格后,在平台申报机制电量与机制电价,申报价格提交后自动封存不可更改;出清结果公示后,入选项目须在结果公布1个月内与市电力公司签订差价协议。 时间窗口:通知2026年9月24日发布,竞价公告应在发布后5个工作日内出台,申报、审核、出清、公示、签约环环相扣,逾期未提交或未按期完成视为放弃资格,有意向的项目主体应尽快准备资质与电量测算材料。 事实依据:北京市发展和改革委员会关于本市2027年新能源增量项目机制电价竞价有关事项的通知
English version — Beijing 2027 New Energy Mechanism Electricity Price Bidding, 850 Million kWh of Electricity Waiting for Application
The Beijing Municipal Development and Reform Commission issued Notice Jing Fa Gai [2026] No. 1598, launching the 2027 new energy incremental project mechanism electricity price bidding. The total bidding electricity scale is 850 million kWh, with wind power and photovoltaic unified application and unified clearing, the bidding ceiling is 0.3598 yuan/kWh, and the mechanism electricity price execution period for selected projects is 12 years. This is a window for new energy projects to lock in long-term stable electricity price returns. For investors, the mechanism electricity price is equivalent to providing a floor for project returns, and the earlier a project applies at a lower electricity price, the more likely it is to be selected. The opportunity points are: First, the scope of bidding entities is clear. New energy projects that are put into operation between June 1, 2025 and December 31, 2027 and have not been included in the mechanism electricity price before can all participate. Distributed photovoltaics can participate independently or in aggregation, and natural person household distributed photovoltaic owners are also eligible; Second, the upper limit of electricity application for a single project is determined by installed capacity multiplied by the annual average power generation utilization hours minus auxiliary power consumption. For Beijing, photovoltaics are calculated at 1,450 hours, wind power at 2,000 hours, and auxiliary power consumption rate at 3%. Project parties can calculate the applicable electricity accordingly; Third, price priority marginal clearing. When the application scale is less than the total scale, all are included, and the highest application price becomes the mechanism electricity